/*! This file is auto-generated */ .wp-block-button__link{color:#fff;background-color:#32373c;border-radius:9999px;box-shadow:none;text-decoration:none;padding:calc(.667em + 2px) calc(1.333em + 2px);font-size:1.125em}.wp-block-file__button{background:#32373c;color:#fff;text-decoration:none} Q13OQ (b). A graphics reproduction firm has... [FREE SOLUTION] | 91Ó°ÊÓ

91Ó°ÊÓ

A graphics reproduction firm has four automatic equipment units but occasionally becomes inoperative because of the need for supplies, maintenance, or repair. Each Unit requires service roughly twice each hour, or, more precisely, each Unit of equipment runs an average of 30 minutes before needing service. Service times vary widely, ranging from a simple service (such as pressing a restart switch or repositioning paper) to more detailed equipment disassembly. The average service time, however, is minutes. Equipment downtime results in a loss of \(20 per hour. The one equipment attendant is Paid \)6 per hour.

Using finite queuing analysis, answer the following questions:

B. What is the average number of units still in operation?

Short Answer

Expert verified

In lining framework, benefit time is characterized as the time required to serve a client.

Step by step solution

01

Operation

Operation the complementary of standard benefit time is called cruel benefit rate and is represented as the number of clients served amid a settled time. In traditional terms, the benefit rate can be characterized as the capacity of the server or machine in the number of units per time.

02

Calculating the average number of Units in operation using the formula

The average numberof Units in operation = Number of unit-down Unit

But down Unit = L+H

The formula becomes;

The average number of units in operation = Number of units-(L+H)

= 4 - (0.256+0.535)

= 4-0.791

= 3.209

The average number of Units in operation = 3.209

Unlock Step-by-Step Solutions & Ace Your Exams!

  • Full Textbook Solutions

    Get detailed explanations and key concepts

  • Unlimited Al creation

    Al flashcards, explanations, exams and more...

  • Ads-free access

    To over 500 millions flashcards

  • Money-back guarantee

    We refund you if you fail your exam.

Over 30 million students worldwide already upgrade their learning with 91Ó°ÊÓ!

One App. One Place for Learning.

All the tools & learning materials you need for study success - in one app.

Get started for free

Most popular questions from this chapter

A firm is selling two products, chairs and bar stools, each at \(50 per unit. Chairs have a variable cost of \)25, and bar stools \(20. Fixed cost for the firm is \)20,000.

a.If the sales mix is 1:1 (one chair sold for every bar stool sold), what is the break-even point in dollars of sales? In units of chairs and bar stools?

b.If the sales mix changes to 1:4 (one chair sold for every four bar stools sold), what is the break-even point in dollars of sales? In units of chairs and bar stools?

A psychological therapist treats patients according to their individual needs. Patients are all treated in the same office on a scheduled basis. Each patient’s treatment is developed and customized for the individual according to the therapist’s professional training. Which of the contrasting service designs in the chapter would best describe the therapist’s service operation?

A local market research firm has just won a contract for several thousand small projects involving data gathering and statistical analysis. In the past, the firm has assigned each project to a single member of its highly trained professional staff. This person would both gather and analyze the data. Using this approach, an experienced person can complete an average of 10 such projects in an eight-hour day. The firm’s management is thinking of assigning two people to each project in order to allow them to specialize and become more efficient. The process would require the data gatherer to i ll out a matrix on the computer, check it, and transmit it to the statistical analysis program for the analyst to complete. Data can be gathered on one project while the analysis is being completed on another, but the analysis must be complete before the statistical analysis program can accept the new data. After some practice, the new process can be completed with a standard time of 20 minutes for the data gathering and 30 minutes for the analysis.

a.What is the production (output per hour) for each alternative? What is the productivity (output per labor hour)?

b.How long would it take to complete 1,000 projects with each alternative? What would be the labor content (total number of labor hours) for 1,000 projects for each alternative?

Question: If the specification is such that no washer should be greater than 2.4 millimeters, assuming that the thicknesses are distributed normally, what fraction of the output is expected to be greater than this thickness?

A firm uses a serial assembly system and needs answers to the following:

a. An output of 900 units per shift (7.5 hours) is desired for a new processing system. The system requires the product to pass through four stations where the work content at each station is 30 seconds. What is the required cycle time for such a system?

b. How efficient is your system with the cycle time you calculated?

c. Station 3 changes and now requires 45 seconds to complete. What will need to be done to meet demand (assume only 7.5 hours are available)? What is the efficiency of the new system?

See all solutions

Recommended explanations on Business Studies Textbooks

View all explanations

What do you think about this solution?

We value your feedback to improve our textbook solutions.

Study anywhere. Anytime. Across all devices.