/*! This file is auto-generated */ .wp-block-button__link{color:#fff;background-color:#32373c;border-radius:9999px;box-shadow:none;text-decoration:none;padding:calc(.667em + 2px) calc(1.333em + 2px);font-size:1.125em}.wp-block-file__button{background:#32373c;color:#fff;text-decoration:none} Q210Q Question: A retail store had sal... [FREE SOLUTION] | 91Ó°ÊÓ

91Ó°ÊÓ

Question: A retail store had sales of \(45,000 in April and \)56,000 in May. The store employs eight full-time workers who work a 40-hour week. In April the store also had seven part-time workers at 10 hours per week, and in May, the store had nine part-timers at 15 hours per week (assume four weeks in each month). Using sales dollars as the measure of output, what is the percentage change in productivity from April to May?

Short Answer

Expert verified

Answer

The percentage change in productivity from April to March is 6.65 per cent

Step by step solution

01

Calculating productivity of April

Productivity=Output in dollarsInput in hours=450008×40+7×10×4=450001560=28.85 dollars per hour

02

Calculating productivity of May

dProductivity=Output in dollarsInput in hours=56008×40+9×15×4=56001820=30.77 dollars per hour

03

Calculating percentage change

Percentage change=Difference of valuesInitial value×100=30.77-28.8528.85×100=1.9228.85×100=0.0665×100=6.65 %

Unlock Step-by-Step Solutions & Ace Your Exams!

  • Full Textbook Solutions

    Get detailed explanations and key concepts

  • Unlimited Al creation

    Al flashcards, explanations, exams and more...

  • Ads-free access

    To over 500 millions flashcards

  • Money-back guarantee

    We refund you if you fail your exam.

Over 30 million students worldwide already upgrade their learning with 91Ó°ÊÓ!

One App. One Place for Learning.

All the tools & learning materials you need for study success - in one app.

Get started for free

Most popular questions from this chapter

Question: Two of the efficiency ratios mentioned in the chapter are the receivable turnover ratio and the inventory turnover ratio. While they are two completely separate measures, they are very similar in one way. What is the common thread between these two?

Owners of a local restaurants are concerned about their ability to provide quality service as they continue to grow and attract more customers. They have collected data from Friday and Saturday nights, their busiest times of the week. During these time periods, about 75 customers arrive per hour for service. Given the number of tables and chairs, and the typical time it takes to serve a customer, the owners estimate they can serve on average about 100 customers per hour. During these nights, are they in the zone of service, the critical zone, or the zone of no service?

In considering a capacity expansion we have two alternatives. The first alternative is expected to cost \(1,000,000 and has an expected profit of \)500,000 over the next three years. The second alternative has an expected cost of \(800,000 and expected a profit of \)450,000 over the next three years. Which alternative should we select, and what is the expected value of the expansion? Assume a 10 percent interest rate.

The R&D department is planning to bid on a large project to develop a new communication system for commercial planes. The accompanying table shows the activities, times, and sequences required:

a. Draw the network diagram.

b. What is the critical path?

c. Suppose you want to shorten the completion time as much as possible, and you have the option of shortening any or all of B, C, D, and G each one week. Which would you shorten?

d. What is the new critical path and earliest completion time?

Lambda Computer Products competed for and won a contract to produce two prototype units of a new type of computer that is based on laser optics rather than on electronic binary bits. The first unit produced by Lambda took 5,000 hours to produce and required \(250,000 worth of material, equipment usage, and supplies. The second unit took 3,500 hours and used \)200,000 worth of materials, equipment usage, and supplies. Labor is $30 per hour.

a. Lambda was asked to present a bid for 10 additional units as soon as the second unit was completed. Production would start immediately. What would this bid be?

b. Suppose there was a significant delay between the contracts. During this time, personnel and equipment were reassigned to other projects. Explain how this would affect the subsequent bid.

See all solutions

Recommended explanations on Business Studies Textbooks

View all explanations

What do you think about this solution?

We value your feedback to improve our textbook solutions.

Study anywhere. Anytime. Across all devices.