/*! This file is auto-generated */ .wp-block-button__link{color:#fff;background-color:#32373c;border-radius:9999px;box-shadow:none;text-decoration:none;padding:calc(.667em + 2px) calc(1.333em + 2px);font-size:1.125em}.wp-block-file__button{background:#32373c;color:#fff;text-decoration:none} Q30Q Question: Dell Computer鈥檚 prim... [FREE SOLUTION] | 91影视

91影视

Question: Dell Computer鈥檚 primary consumer business takes orders from customers for specific configurations of desktop and laptop computers. Customers must select from a certain model line of computer and choose from available parts, but within those constraints may customize the computer as they desire. Once the order is received, Dell assembles the computer as ordered and delivers it to the customer. What type of manufacturing process is described here?

Short Answer

Expert verified

Answer

Theassemble-to-order process is the manufacturing process described in the given question.

Step by step solution

01

Assemble-to-order

Assemble-to-order is a manufacturing method in which the items given to the client are customized and made when and at the consumer鈥檚 request. This process mainly requires flexibility, and these companies use the lean manufacturing process to minimize the time consumption to assemble the finished product. This makes it possible for such companies to quickly and efficiently cater to consumers鈥 needs.

02

Dell’s computer demand

As mentioned in the question, the consumers can customize the computer from the available parts and line and model line. The company then assembles the computer according to the order and delivers it to the buyer. This reflects the flexibility in the assembling process. These are the features of the assemble-to-make process, especially the customizable property and flexibility in assembling and quick delivery of the product. Hence, the mentioned process is an assemble-to-order process.

Unlock Step-by-Step Solutions & Ace Your Exams!

  • Full Textbook Solutions

    Get detailed explanations and key concepts

  • Unlimited Al creation

    Al flashcards, explanations, exams and more...

  • Ads-free access

    To over 500 millions flashcards

  • Money-back guarantee

    We refund you if you fail your exam.

Over 30 million students worldwide already upgrade their learning with 91影视!

One App. One Place for Learning.

All the tools & learning materials you need for study success - in one app.

Get started for free

Most popular questions from this chapter

Question:The diagram below represents a process where two components are made at stations A1 and A2 (one component is made at A1 and the other at A2). These components are then assembled at station B and moved through the rest of the process, where some additional work is completed at stations C, D, and E. Assume that one and only one person is allowed at each station. Assume that the times given below for each station represent the amount of work that needs to be done at that station by that person, with no processing time variation. Assume that inventory is not allowed to build into the system.

What is the average hourly output of the process when it is in normal operation?

What is the objective of assembly-line balancing? How would you deal with the situation where one worker, although trying hard, is 20 percent slower than the other 10 people in a line?

Question: The following represents a process used to assemble a chair with an upholstered seat. Stations A, B, and C make the seat; stations J, K, and L assemble the chair frame; station X is where the two subassemblies are brought together; and some final tasks are completed in stations Y and Z. One worker is assigned to each of the stations. The line is paced using a countdown clock to synchronize production at each station.

Generally there is no inventory kept anywhere in the system, although there is

room for one unit between each of the stations that might be used for a brief amount of time.

Given the following amount of work in seconds required at each station:

a

38

j

32

x

22

b

34

k

30

y

18

c

35

l

34

z

20

a. What is the possible daily output of this 鈥減rocess鈥 if 8 hours of processing time is available each day?

b. Given your output rate in part (a), what is the efficiency of the process?

c. What is the flow time of the process?

Question:A processor makes two components, A and B, which are then packaged together as the final product (each product sold contains one A and one B). The processor can do only components at a time: Either it can make As or it can make Bs. There is a setup time when switching from A to B. Current plans are to make 100 units of component A, then 100 units of component B, then 100 units of component A, then 100 units of component B, and so forth, where the setup and run times for each component are given below.

Component Setup/Changeover Time Run Time/Unit

A 5 minutes 0.2 minute

B 10 minutes 0.1 minute

Assume the packaging of the two components is totally automated and takes only two seconds per unit of the final product. This packaging time is small enough that you can ignore it. What is the average hourly output, in terms of the number of units of the packaged product (which includes one component A and one component B)?

What is a customer order decoupling point? Why is it important?

See all solutions

Recommended explanations on Business Studies Textbooks

View all explanations

What do you think about this solution?

We value your feedback to improve our textbook solutions.

Study anywhere. Anytime. Across all devices.