Chapter 23: Q1RQ (page 1305)
What is a variance?
Short Answer
Answer
The discrepancy between a predicted and actual sum is known as a variance.
/*! This file is auto-generated */ .wp-block-button__link{color:#fff;background-color:#32373c;border-radius:9999px;box-shadow:none;text-decoration:none;padding:calc(.667em + 2px) calc(1.333em + 2px);font-size:1.125em}.wp-block-file__button{background:#32373c;color:#fff;text-decoration:none}
Learning Materials
Features
Discover
Chapter 23: Q1RQ (page 1305)
What is a variance?
Answer
The discrepancy between a predicted and actual sum is known as a variance.
All the tools & learning materials you need for study success - in one app.
Get started for free
Briefly describe how journal entries differ in a standard cost system.
Question:Match the variance to the correct definition.
Variance Definition
2. Cost variance
3. Efficiency variance
4. Flexible budget variance
5. Sales volume variance
6. Static budget variance
a. The difference between the expected results in the flexible budget for the actual units sold and the static budget.
b. The difference between actual results and the expected results in the flexible budget for the actual units sold.
c. Measures how well the business keeps unit costs of material and labor inputs within standards.
d. The difference between actual results and the expected results in the static budget.
e. Measures how well the business uses its materials or human resources
Preparing a standard cost income statement Review your results from Problem P23Â33B.
Middleton’s actual and standard sales price per mug is $5. Prepare the standard cost income statement for July 2018.
Preparing flexible budgets
Moje, Inc. manufactures travel locks. The budgeted selling price is \(19 per lock, thevariable cost is \)9 per lock, and budgeted fixed costs are $13,000 per month. Prepare aflexible budget for output levels of 4,000 locks and 11,000 locks for the month endedApril 30, 2018.
Matthews Fender, which uses a standard cost system, manufactured 20,000 boat fenders during 2018, using 143,000 square feet of extruded vinyl purchased at \(1.30 per square foot. Production required 400 direct labor hours that cost \)16.00 per hour. The direct materials standard was seven square feet of vinyl per fender, at a standard cost of \(1.35 per square foot. The labor standard was 0.028 direct labor hour per fender, at a standard cost of \)15.00 per hour.
Compute the cost and efficiency variances for direct materials and direct labor. Does the pattern of variances suggest Matthews Fender’s managers have been making tradeoffs? Explain.
What do you think about this solution?
We value your feedback to improve our textbook solutions.