/*! This file is auto-generated */ .wp-block-button__link{color:#fff;background-color:#32373c;border-radius:9999px;box-shadow:none;text-decoration:none;padding:calc(.667em + 2px) calc(1.333em + 2px);font-size:1.125em}.wp-block-file__button{background:#32373c;color:#fff;text-decoration:none} Q28P You bring a boat toward the dock... [FREE SOLUTION] | 91Ó°ÊÓ

91Ó°ÊÓ

You bring a boat toward the dock by pulling on a rope with a force of130 N through a distance of 6 M . (a) How much work do you do? (Include the appropriate sign.) (b) Then you slow the boat down by pushing against it with a force of 40 N, opposite to the boat’s movement of. How much work do you do? (Include the appropriate sign.) (c) What is the total amount of work that you do?

Short Answer

Expert verified

(a)+780J

(b)-200J

(c)580J

Step by step solution

01

Identification of the given data

The given data can be listed below as-

  • The force by which the boat has been pulled is, 130 N.
  • The distance through which the boat has been pulled is, 6 m .
  • The force needed to slow down the boat is,40 N .
  • The distance opposite to the movement of the boat is, 5 m.
02

Explanation of the work done

The work done for an object can be determined by taking the product of force applied on the object and the distance by which the object due to the application of force.

The equation of the work done is given as follows,

W=Fd ..(1)

Here, F is the force required to be exerted on the object and d is the distance by which the object moved from its position.

03

Determination of the amount of work done for pulling the boat towards the dock

ForF=130N andd=6m in equation (1).

role="math" localid="1654146885708" W1=130N×6m=780Nm=780Nm×1J1Nm=780J

Thus, the work done is +780J.

04

Determination of the amount of work done for slowing the boat down

ForF=-40N×5m=200Nm×1J1Nm=200J and in equation (1).

Thus, the work done is-200J .

05

Determination of the total amount of work done

(c)

The total amount of work done is expressed as,

W=W1+W2

Substituting all the values in the above equation.

W=+780J+-200J=580J

Thus, the total amount of work done is580J .

Unlock Step-by-Step Solutions & Ace Your Exams!

  • Full Textbook Solutions

    Get detailed explanations and key concepts

  • Unlimited Al creation

    Al flashcards, explanations, exams and more...

  • Ads-free access

    To over 500 millions flashcards

  • Money-back guarantee

    We refund you if you fail your exam.

Over 30 million students worldwide already upgrade their learning with 91Ó°ÊÓ!

One App. One Place for Learning.

All the tools & learning materials you need for study success - in one app.

Get started for free

Most popular questions from this chapter

The point of this question is to compare rest energy and kinetic energy at high speeds. An alpha particle (a helium nucleus) is moving at a speed of 0.9993times the speed of light. Its mass is 6.40×10-27kg(a) what is its rest energy? (b) Is it okay to calculate its kinetic energy using the expressionK-12mv2?(c) What is its kinetic energy? (d) Which is true? A. the kinetic energy is approximately equal to the rest energy. B. The kinetic energy is much bigger than the rest energy. C. The kinetic energy is much smaller than the rest energy.

The deuteron, the nucleus of the deuterium atom ("heavy" hydrogen), consists of a proton and a neutron. It is observed experimentally than a high energy photon ("gamma ray") with a minimum energy of 2.2 MeVcan break up the deuteron into a free proton and a free neutron; this process is called "photodissociation." About what fraction of the deuteron rest energy corresponds to its Binding energy? The result shows that the deuteron is very lightly bound than the iron nucleus.

An electron traveling through a curving wire in an electric circuit experiences a constant force of 5×10-19N, always in the direction of its motion through the wire. How much work is done on the electron by this force as it travels through 0.5 m of the wire?

A0.5kg teddy bear is nudged off a window sill and falls 2m to the ground. (a) What is the kinetic energy at the instant it hits the ground? What is its speed? What assumptions or approximations did you make in this calculation?

(b) A 1.0kg flowerpot is nudged off a window sill and falls 2m to the ground. What is the kinetic energy at the instant it hits the ground? What is its speed? How do the speed and kinetic energy compare to that of the teddy bear in part (a)?

A comet is in elliptical orbit around the Sun. Its closest approach to the Sun is a distance of 4×1010m (inside the orbit of Mercury), at which point its speed is 8.17×104m/s. Its farthest distance from the Sun is far beyond the orbit of Pluto. What is its speed when it is 6×1012m from the Sun? (This is the approximate distance of Pluto from the Sun.)

See all solutions

Recommended explanations on Physics Textbooks

View all explanations

What do you think about this solution?

We value your feedback to improve our textbook solutions.

Study anywhere. Anytime. Across all devices.