/*! This file is auto-generated */ .wp-block-button__link{color:#fff;background-color:#32373c;border-radius:9999px;box-shadow:none;text-decoration:none;padding:calc(.667em + 2px) calc(1.333em + 2px);font-size:1.125em}.wp-block-file__button{background:#32373c;color:#fff;text-decoration:none} 44P A skier is pulled by a towrope u... [FREE SOLUTION] | 91Ó°ÊÓ

91Ó°ÊÓ

A skier is pulled by a towrope up a frictionless ski slope that makes an angle of12°with the horizontal. The rope moves parallel to the slope with a constant speed of 1.0m/s. The force of the rope does 900Jof work on the skier as the skier moves a distance of 8.0mup the incline. (a) If the rope moved with a constant speed of 2.0m/s, how much work would the force of the rope do on the skier as the skier moved a distance of 8.0mup the incline? At what rate is the force of the rope doing work on the skier when the rope moves with a speed of (b)1.0m/sand (c)2.0m/s?

Short Answer

Expert verified
  1. The work done by the force of the rope on the skier at speed 2.0m/sis same that when speed is 1.0 m/s.
  2. The rate of doing work when rope moves with speed of1.0m/sis112.5W
  3. The rate of doing work when rope moves with speed of2.0m/sis225W

Step by step solution

01

Given

W=900Jspeed=1.0m/s

02

Concept

The rate at which force does the work on the object is called as power due to the force. The work done on a particle by a constant force during its displacement is given as

W=F→.d→

Formula:

W=F→.d→Pavg=W∆t=Fv
03

(a) Calculate the work done

The skier and the rope are moving with constant speed. Hence, the net force on the skier is zero. The force oftherope is balanced by the component of the gravity along the incline. This force is constant and not related to the speed of the rope. Hence, when the same force acts on the rope and moves it throughthesame distance, the work done by the force of the rope isthesame even though the speed changes to 2.0m/s.

The work done is given by

W=F→.d→

04

(b) Calculate the force

W=F→.d→=Fd

Hence, we determine the force as

F=Wd

Substitute all the value in the above equation.

F=900J8m=112.5N

Hence the force is, 112.5 N.

05

(c) Calculate the average power

Here, both the force and velocity of the rope are in the same direction. Hence, the rate of doing work i.e. power can be calculated as

Pavg=W∆tPavg=Fv

Substitute all the value in the above equation.

Pavg=112.5N×1.0m/s=112.5W

When the speed of the rope changes, only the power will change since the force of the rope is constant and independent of speed. Hence we get,

Pavg=W∆tPavg=Fv

Substitute all the value in the above equation.

Pavg=112.5N×2.0m/s=225W

Hence the rate of doing work when rope moves with speed of 1.0m/sis112.5Wand The rate of doing work when rope moves with speed of 2.0m/sis225W.

Unlock Step-by-Step Solutions & Ace Your Exams!

  • Full Textbook Solutions

    Get detailed explanations and key concepts

  • Unlimited Al creation

    Al flashcards, explanations, exams and more...

  • Ads-free access

    To over 500 millions flashcards

  • Money-back guarantee

    We refund you if you fail your exam.

Over 30 million students worldwide already upgrade their learning with 91Ó°ÊÓ!

One App. One Place for Learning.

All the tools & learning materials you need for study success - in one app.

Get started for free

Most popular questions from this chapter

A force of 5.0 Nacts on a 15.0 kgbody initially at rest. Compute the work done by the force in (a) the first, (b) the second, and (c) the third seconds and (d) the instantaneous power due to the force at the end of the third second.

Question: The system in Fig. 12-28 is in equilibrium, with the string in the center exactly horizontal. Block A weighs 40 N , block Bweighs 50 N , and angle ϕ is 350 . Find (a) tension T1 , (b) tension T2 , (c) tension T3 , and (d) angle θ .

Time standards are now based on atomic clocks. A promising second standard is based on pulsars, which are rotating neutron stars (highly compact stars consisting only of neutrons). Some rotate at a rate that is highly stable, sending out a radio beacon that sweeps briefly across Earth once with each rotation, like a lighthouse beacon. Pulsar PSR 1937 + 21 is an example; it rotates once every 1.557 806 448 872 75±3 ms, where the trailing±3 indicates the uncertainty in the last decimal place (it does not mean±3 ms). (a) How many rotations does PSR 1937 + 21 make in 7.00 days? (b) How much time does the pulsar take to rotate exactly one million times and (c) what is the associated uncertainty?

The force on a particle is directed along an x axis and given byF=F0(xx0-1). Find the work done by the force in moving the particle from x=0tox=x0 by (a) plotting F(x) and measuring the work from the graph and (b) integratingF(x).

The two vectors shown in Fig. 3-21 lie in a xy plane. What are the signs

of the x and y components, respectively, of (a)d⇶Ä1+d⇶Ä2,(b)d⇶Ä1-d⇶Ä2,and(c)d⇶Ä2-d⇶Ä1?

See all solutions

Recommended explanations on Physics Textbooks

View all explanations

What do you think about this solution?

We value your feedback to improve our textbook solutions.

Study anywhere. Anytime. Across all devices.