/*! This file is auto-generated */ .wp-block-button__link{color:#fff;background-color:#32373c;border-radius:9999px;box-shadow:none;text-decoration:none;padding:calc(.667em + 2px) calc(1.333em + 2px);font-size:1.125em}.wp-block-file__button{background:#32373c;color:#fff;text-decoration:none} Q4-6DQ Why would subcontractors for a g... [FREE SOLUTION] | 91Ó°ÊÓ

91Ó°ÊÓ

Why would subcontractors for a government project want their activities on the critical path? Under what conditions would they try to avoid being on the critical path?

Short Answer

Expert verified

A project is a series of tasks that must be done to accomplish a specific goal as well as results. These tasks can be simple as well as complicated depending on the magnitude as well as the complexity of the effort, but all efforts can be broken down into objectives and what has to be overcome to improve objectives. Projects allow us to implement important adjustments in an orderly and less prone to error manner.

Step by step solution

01

Subcontractors working on a government initiative want their work to be on the critical route

A subcontractor may wish to move his operations of thecritical routedue to a mistake on his side or since he does not need to be disturbed by the close supervision of performance that is commonly associated with key path tasks. Subcontractors are often prepared to be on important pathways since it makes the overall project appear more standardized. Good initiatives have the capability of absorbing more funds.

This project also has a timetable in place to allow subcontractors to appropriately distribute expenses. However, a subcontractor may desire to deviate from key lines at some stage. For instance, a subcontractor may have committed an error at a certain time. In this instance, the subcontractor is more prepared to establish a new schedule without paying extra charges.

02

To avoid being on the critical path conditions

Inconditionswhen monetary benefits are granted for timely completion of the project, a subcontractor may prefer his operations to be on the crucial route. Because the crucial path finally decides project duration, it makes sense that operations along the path would attract greater cash to speed completion.

Slack time is determined by the length of period a job may be postponed without causing some other work to be delayed as well as affecting the project's date of finishing. This is the length of period that an operation may be postponed without causing the whole project to be delayed. The proportion of slack accessible duration is the disparity among the set deadline as well as the needed dates to satisfy the critical route.

Unlock Step-by-Step Solutions & Ace Your Exams!

  • Full Textbook Solutions

    Get detailed explanations and key concepts

  • Unlimited Al creation

    Al flashcards, explanations, exams and more...

  • Ads-free access

    To over 500 millions flashcards

  • Money-back guarantee

    We refund you if you fail your exam.

Over 30 million students worldwide already upgrade their learning with 91Ó°ÊÓ!

One App. One Place for Learning.

All the tools & learning materials you need for study success - in one app.

Get started for free

Most popular questions from this chapter

What is the name of the process in which one company studies the processes of another firm to identify best practices?

Perot Corporation is developing a new CPU chip based on a new type of technology. Its new chip, the Patay2 chip, will take two years to develop. However, because other chip manufacturers will be able to copy the technology, it will have a market life of two years after it is introduced. Perot expects to be able to price the chip higher in the first year, and it anticipates a significant production cost reduction after the first year as well. The relevant information for developing and selling the Patay2 is given below

Patay2 Chip Product Estimates

Patay2 Chip Project Timing

a. What are this project's yearly cash flows and their present value (discounted at 10 percent)? What is the net present value?

b. Perot’s engineers have determined that spending \(10 million more on developmentwill allow them to add even more advanced features. Having a more advanced chipwill allow them to price the chip \)50 higher in both years (\(870 for year 1 and \)700for year 2). Is it worth the additional investment?

c. c. If sales are only 200,000 the first year and 100,000 the second year, would Perot stilldo the project?

Question: Consider the following financial data from the past year for Midwest Outdoor Equipment Corporation.

Gross income $25,240,000

Total sales 24,324,000

Total credit sales 18,785,000

Net income 2,975,000

Cost of goods sold 12,600,000

Total assets 10,550,000

Average inventory 2,875,000

Average receivables 3,445,000

a. Compute the receivable turnover ratio.

b. Compute the inventory turnover ratio.

c. Compute the asset turnover ratio.

Lambda Computer Products competed for and won a contract to produce two prototype units of a new type of computer that is based on laser optics rather than on electronic binary bits. The first unit produced by Lambda took 5,000 hours to produce and required \(250,000 worth of material, equipment usage, and supplies. The second unit took 3,500 hours and used \)200,000 worth of materials, equipment usage, and supplies. Labor is $30 per hour.

a. Lambda was asked to present a bid for 10 additional units as soon as the second unit was completed. Production would start immediately. What would this bid be?

b. Suppose there was a significant delay between the contracts. During this time, personnel and equipment were reassigned to other projects. Explain how this would affect the subsequent bid.

Do the concepts of complexity and divergence apply to an online sales company such as Dell Computer?

See all solutions

Recommended explanations on Business Studies Textbooks

View all explanations

What do you think about this solution?

We value your feedback to improve our textbook solutions.

Study anywhere. Anytime. Across all devices.