/*! This file is auto-generated */ .wp-block-button__link{color:#fff;background-color:#32373c;border-radius:9999px;box-shadow:none;text-decoration:none;padding:calc(.667em + 2px) calc(1.333em + 2px);font-size:1.125em}.wp-block-file__button{background:#32373c;color:#fff;text-decoration:none} Q180Q Question: A U.S. manufacturing c... [FREE SOLUTION] | 91Ó°ÊÓ

91Ó°ÊÓ

Question: A U.S. manufacturing company operating a subsidiary in an LDC (less-developed country) shows the following results:

a. Calculate partial labor and capital productivity figures for the parent and subsidiary. Do the results seem confusing?

b. Compute the multifactor productivity figures for labor and capital together. Do the results make more sense?

c. Calculate raw material productivity figures (units/\( were \)1 5 FC 10). Explain why these figures might be greater in the subsidiary

Short Answer

Expert verified

Answer

a. Labor productivity

  • U.S: 5 units per hour
  • LDC: 1.33 units per hour

Capital equipment productivity

  • U.S: 1.67 units per hour
  • LDC: 4 units per hour

Yes

b. Multifactor productivity

  • U.S: 1.25 units per hour
  • LDC: 1.00 units per hour

Yes

c. Raw material productivity

  • U.S: 5 units per dollar
  • LCD: 10 units per dollar
  • Due to the lower cost of raw material

Step by step solution

01

Getting the formula for productivity

Productivity is measured by dividing the input by output. The higher the result, the higher the productivity

02

(a) Calculating labor productivity.

Labor productivity of U.S=OutputInput in hours=10000020000=5 units per hourLabor productivity of LDC=OutputInput in hours=2000015000=1.33 units per hour

03

Calculating capital productivity

Capital productivity of U.S=OutputInput in hours=10000060000=1.67 units per hour\Capital productivity of LDC=OutputInput in hours=200005000=4 units per hour

04

Analyzing if the result is confusing

Yes, labor productivity is higher in the U.S., but capital productivity is lower. The measure seems to contradict.

05

Defining multifactor productivity

When productivity is measured by combining various inputs, and the result is used for diving output, it is known as multifactor productivity.

06

(b) Calculating multifactor productivity

Multifactor productivity for U.S=OutputRaw material + Capital equipments=10000020000+60000=10000080000=1.25 units per hourMultifactor productivity for LDC=OutputRaw material + Capital equipment=2000015000+5000=2000020000=1 unit per hour

07

Analyzing if the result is better

Yes, multifactor productivity is much better as labor and equipment can be substituted for each other.

08

(c) Calculating raw material productivity

Given: that $1 is equal to FC 10

Raw material productivity of U.S=OutputInput in dollars=10000020000=5 units per dollarRaw material productivity of LDC=OutputInput in dollars=200002000=10 units per dollar

09

Analyzing why these figures will be greater in subsidiaries

The raw material productivity will be higher for subsidiaries because the cost of raw materials is low in LCD, which increases productivity.

Unlock Step-by-Step Solutions & Ace Your Exams!

  • Full Textbook Solutions

    Get detailed explanations and key concepts

  • Unlimited Al creation

    Al flashcards, explanations, exams and more...

  • Ads-free access

    To over 500 millions flashcards

  • Money-back guarantee

    We refund you if you fail your exam.

Over 30 million students worldwide already upgrade their learning with 91Ó°ÊÓ!

One App. One Place for Learning.

All the tools & learning materials you need for study success - in one app.

Get started for free

Most popular questions from this chapter

Now, look at the effect of increasing the number of beds by 50 percent. How many operations could the hospital perform per day before running out of bed capacity? (Assume operations are performed five days per week, with the same number performed on each day.) How well would the new resources be utilized relative to the current operation? Could the hospital perform this many operations? Why?

Match the following OSCM job titles with the appropriate duties and responsibilities.

Plant manager A. Plans and coordinates staff activities such as new product development and new facility location.

Supply chain manager B. Oversees the movement of goods throughout the supply chain.

Project manager C. Oversees the workforce and resources required to produce the firm’s products.

Business process improvement analyst D. Negotiates contracts with vendors and coordinates the flow of material inputs to the production process.

Logistics manager E. Applies the tools of lean production to reduce cycle time and eliminate waste in a process.

A facility has a maximum capacity of 4,000 units per day using overtime and skipping the daily maintenance routine. At 3,500 units per day, the facility operates at a level where the average cost per unit is minimized. Currently, the process is scheduled to operate at a level of 3,000 units per day. What is the capacity utilization rate?

Question: 10. Tuff Wheels was getting ready to start its development project for a new product to be added to its small motorized vehicle line for children. The new product is called the Kiddy Dozer. It will look like a miniature bulldozer, with caterpillar tracks and a blade. Tuff Wheels has forecasted the demand and the cost of developing and producing the new Kiddy Dozer. The table below contains the relevant information for this project.

Tuff Wheels also has provided the project plan shown below. As can be seen in the project plan, the company thinks that the product life will be three years until a new product must be created.

a. What are the yearly cash flows and their present value (discounted at 8 percent) of this project? What is the net present value?

b. What is the impact on NPV for the Kiddy Dozer if the actual unit sales are 50,000 per year or 70,000 per year?

c. What is the effect caused by changing the discount rate to 9, 10, or 11 percent?

A builder has located a piece of property that she would like to buy and eventually build on. The land is currently zoned for four homes per acre, but she is planning to request new zoning. What she builds depends on the approval of zoning requests and your analysis of this problem to advise her. With her input and your help, the decision process has been reduced to the following costs, alternatives, and probabilities:

Cost of land: \(2 million.

Probability of rezoning: 60.

If the land is rezoned, there will be additional costs for new roads, lighting, and so on, of \)1 million. If the land is rezoned, the contractor must decide whether to build a shopping center or1, 500 apartments that the tentative plan shows would be possible. If she builds a shopping center, there is a 70 percent chance that she can sell the shopping center to a large department store chain for \(4 million over her construction cost, which excludes the land; and there is a 30 percent chance that she can sell it to an insurance company for \)5 million over her construction cost (also excluding the land). If instead of the shopping center, she decides to build the 1,500 apartments, she places probabilities on the profits as follows:

There is a 60 percent chance that she can sell the apartments to a real estate investment corporation for \(3,000 each over her construction cost; there is a 40 percent chance that she can get only \)2,000 each over her construction cost. (Both exclude the land cost.)

If the land is not rezoned, she will comply with the existing zoning restrictions and simply build 600 homes, on which she expects to make $4,000 over the construction cost on each one (excluding the cost of land).

Draw a decision tree of the problem and determine the best solution and the expected net profit.

See all solutions

Recommended explanations on Business Studies Textbooks

View all explanations

What do you think about this solution?

We value your feedback to improve our textbook solutions.

Study anywhere. Anytime. Across all devices.