/*! This file is auto-generated */ .wp-block-button__link{color:#fff;background-color:#32373c;border-radius:9999px;box-shadow:none;text-decoration:none;padding:calc(.667em + 2px) calc(1.333em + 2px);font-size:1.125em}.wp-block-file__button{background:#32373c;color:#fff;text-decoration:none} Q9-9PE. Question: What are the four stra... [FREE SOLUTION] | 91Ó°ÊÓ

91Ó°ÊÓ

Question: What are the four strategies for managing customer-induced variability?

Short Answer

Expert verified

The four strategies for managing customer induced variability are given below:

a) Classic accommodation

b) Low-cost accommodation

c) Classic reduction

d) Uncompromised reduction

Step by step solution

01

Classic accommodation

Classical accommodation includes, for instance, additional workers as well as increased staff abilities to compensate for client variances.

02

 Step 2: Low-cost accommodation

Low-cost accommodation that utilizes low-cost labor, leasing, as well as self-service to reduce the expense of accommodation.

03

Classic reduction

Classical reduction, necessitates clients engaging in greater self-service, using reservation technologies, as well as adjusting their demands

04

Step 4:Uncompromised reduction

Uncompromised reduction, which leverages customer information to build processes that provide quality service while limiting the impact of variance on the provider delivery systems.

Unlock Step-by-Step Solutions & Ace Your Exams!

  • Full Textbook Solutions

    Get detailed explanations and key concepts

  • Unlimited Al creation

    Al flashcards, explanations, exams and more...

  • Ads-free access

    To over 500 millions flashcards

  • Money-back guarantee

    We refund you if you fail your exam.

Over 30 million students worldwide already upgrade their learning with 91Ó°ÊÓ!

One App. One Place for Learning.

All the tools & learning materials you need for study success - in one app.

Get started for free

Most popular questions from this chapter

Question:The following table lists all costs of quality incurred by Sam’s Surf Shop last year. What was Sam’s appraisal cost for quality last year?

Annual inspection cost

\(155,000

The annual cost of scarp materials

\)286,000

Annual rework cost

\(34,679

The annual cost of quality training

\)456,000

Annual warranty cost

\(1,546,000

Annual testing cost

\)543,000

How do you determine the idle time percentage from a given assembly-line balance?

Question: The flow of materials through eight departments is shown on the next page. Even though the table shows flows into and out of the different departments, assume that the direction of flow is not important. In addition, assume that the cost of moving material depends only on the distance moved.

a. Construct a schematic layout where the departments are arranged on a 2 x 4 grid with each cell representing a 10 x 10-meter square area.

b. Evaluate your layout using a distance-times-flow measure. Assume that distance is measured rectilinearly (in this case, departments that are directly adjacent are 10 meters apart and those that are diagonal to one another are 20 meters apart).

A small barbershop has a single chair and an area for waiting, where only one person can be in the chair at a time, and no one leaves without getting their hair cut. So the system is rough:

Entrance →Wait →Haircut →Exit

Assume customers arrive at the rate of 10 per hour and stay an average of 0.5 hours. What is the average number of customers in the barbershop?

Question: Francis Johnson’s plant needs to design an efficient assembly line to make a new product. The assembly line needs to produce 15 units per hour, and there is room for only four workstations. The tasks and the order in which they must be performed are shown in the following table. Tasks cannot be split, and it would be too expensive to duplicate any task.

Task

Task Time

(Minutes)

Immediate

Predecessor

A

1

-

B

2

-

C

3

-

D

1

A,B,C

E

3

C

F

2

E

G

3

E

a. Draw the precedence diagram.

b. What is the workstation cycle time required to produce 15 units per hour?

c. Balance the line so that only four workstations are required. Use whatever method you feel is appropriate.

d. What is the efficiency of your line balance, assuming the cycle time from part (b)?

See all solutions

Recommended explanations on Business Studies Textbooks

View all explanations

What do you think about this solution?

We value your feedback to improve our textbook solutions.