/*! This file is auto-generated */ .wp-block-button__link{color:#fff;background-color:#32373c;border-radius:9999px;box-shadow:none;text-decoration:none;padding:calc(.667em + 2px) calc(1.333em + 2px);font-size:1.125em}.wp-block-file__button{background:#32373c;color:#fff;text-decoration:none} Q5OQ An assembly line is to operate e... [FREE SOLUTION] | 91Ó°ÊÓ

91Ó°ÊÓ

An assembly line is to operate eight hours per day with the desired output of 240 units per day. The following table contains information on this product’s task times and precedence relationships:

Task

Task Time (seconds)

Immediate predecessor

A

60

-

B

80

A

C

20

A

D

50

A

E

90

B,C

F

30

C,D

G

30

E,F

H

60

G


  1. Draw the precedence diagram.
  2. b.What is the workstation cycle time required to produce 240 units per day?
  3. Balance this line using the longest task time.
  4. What is the efficiency of your line balance, assuming it is running at the cycle time from part (b)?

Short Answer

Expert verified

The method that is used in the process of mass manufacturing any items is referred to as Assembly lines.

Step by step solution

01

(a) The precedence diagram

02

(b) The workstation cycle time required to produce 240 units per day

03

(c) Balancing line using the longest task time

04

(d) The efficiency of your line balance, assuming it is running at the cycle time from part (b)

The formula is given below-

Efficiency = (Sum of task time)/(workstationxcycle time)

Given,

Sum of task time = 400 seconds

Workstation = 2

Cycle time = 60

Efficiency=400seconds/2 workstationsx60 cycle time

=3.33%

Hence, the efficiency of line balance is 3.33%.

Unlock Step-by-Step Solutions & Ace Your Exams!

  • Full Textbook Solutions

    Get detailed explanations and key concepts

  • Unlimited Al creation

    Al flashcards, explanations, exams and more...

  • Ads-free access

    To over 500 millions flashcards

  • Money-back guarantee

    We refund you if you fail your exam.

Over 30 million students worldwide already upgrade their learning with 91Ó°ÊÓ!

One App. One Place for Learning.

All the tools & learning materials you need for study success - in one app.

Get started for free

Most popular questions from this chapter

The Dorton University president has asked the OSCM department to assign eight biology professors (A, B, C, D, E, F, G, and H) to eight offices (numbered 1 to 8 in the diagram) in the new biology building

a. If there are no restrictions (constraints) on the assignment of professors to offices, how many alternative assignments are there to evaluate?

b. The biology department has sent the following information and requests to the OSCM department:

Offices 1, 4, 5, and 8 are the only offices with windows.

A must be assigned Office 1.

D and E, the biology department co-chair people, must have windows.

H must be direct across the courtyard from D.

A, G, and H must be in the same wing.

F must not be next to D or G or directly across from G.

Find the optimal assignment of professors to offices that meets all the requests of the biology department and minimizes total material handling cost. You may use the path low list as a computational aid.

Question: What are the four strategies for managing customer-induced variability?

What is the essential requirement for mixed-model lines to be practical?

Question: An important difference between service and manufacturing operations is that customers introduce far more variability into the operations in a service system. Name at least three of the basic types of variation that customers bring to a service system.

Question:If the process could be improved so that the standard deviations were only about .10 millimeters, what would be the best that could be expected with the processes relative to fraction defective?

See all solutions

Recommended explanations on Business Studies Textbooks

View all explanations

What do you think about this solution?

We value your feedback to improve our textbook solutions.

Study anywhere. Anytime. Across all devices.