/*! This file is auto-generated */ .wp-block-button__link{color:#fff;background-color:#32373c;border-radius:9999px;box-shadow:none;text-decoration:none;padding:calc(.667em + 2px) calc(1.333em + 2px);font-size:1.125em}.wp-block-file__button{background:#32373c;color:#fff;text-decoration:none} 14-12OQ A bottling plant fills 2,400 bot... [FREE SOLUTION] | 91Ó°ÊÓ

91Ó°ÊÓ

A bottling plant fills 2,400 bottles every two hours. The lead time is 40 minutes and a container accommodates 120 bottles. The safety stock is 10 percent of expected demand. How many kanban cards are needed?

Short Answer

Expert verified

In this situation, Karban card sets are required.

Step by step solution

01

Equation through which Karban card set is calculated

K = DL(1+S)/C

Where K = number of karban cards needed

D =average demand

L =lead time

S =safety stock

C = container size

02

Calculate the Karban card set

D =2400

L =40

S =0.1 (as a percent of 10)

C =120

K= 2400 x 40(1+0.1)/120

K= 105,600/120

K= 880

So, 880 Karban card sets are required.

Unlock Step-by-Step Solutions & Ace Your Exams!

  • Full Textbook Solutions

    Get detailed explanations and key concepts

  • Unlimited Al creation

    Al flashcards, explanations, exams and more...

  • Ads-free access

    To over 500 millions flashcards

  • Money-back guarantee

    We refund you if you fail your exam.

Over 30 million students worldwide already upgrade their learning with 91Ó°ÊÓ!

One App. One Place for Learning.

All the tools & learning materials you need for study success - in one app.

Get started for free

Most popular questions from this chapter

How do facility location decisions differ for service facilities and manufacturing plants?

The chapter presents multiple techniques that service firms can use to make their processes leaner. Which technique is demonstrated by a restaurant that offers special discounts midweek to attract more demand during a traditionally slow period?

Question: Your company assembles five different models of a motor scooter that is sold in specialty stores in the United States. The company uses the same engine for all five models. You have been given the assignment of choosing a supplier for these engines for the coming year. Due to the size of your warehouse and other administrative restrictions, you must order the engines in lot sizes of 1,000 each. Because of the unique characteristics of the engine, special tooling is needed during the manufacturing process for which you agree to reimburse the supplier. Your assistant has obtained quotes from two reliable engine suppliers and you need to decide which to use. The following data have been collected:

Requirements (annual forecast)

12,000 units

Weigh per engine

22 pounds

Order processing cost

\(125 per order

Inventory carry cost

20 percent of the average value of inventory per year


Order quantity

Supplier 1 Unit Price

Supplier 2 Unit Price

1 to 1499 units/ order

\)510.00

\(505.00

1500 to 2999 units/order

500.00

\)505.00

3000 + units/order

490.00

488.00

Tooling costs

\(22.000

\)20.000

Distances

125 miles

100 miles

Note: Assume that half of the lot size is in inventory on average (1,000/2 =500 units).

Two qualified suppliers have submitted the following quotations:

Order quantity

Supplier 1 Unit Price

Supplier 2 Unit Price

1 to 1499 units/ order

\(510.00

\)505.00

1500 to 2999 units/order

500.00

\(505.00

3000 + units/order

490.00

488.00

Tooling costs

\)22.000

\(20.000

Distances

125 miles

100 miles

Your assistant has obtained the following freight rates from your carrier:

Truckload (40,00 lbs. Each load):

\)0.80 per ton-mile

Less-than-truckload

$1.20 per ton-mile

Note: Per ton-mile 5 2,000 lbs. per mile.

a. Perform a total cost of ownership analysis and select a supplier.

b. Would it make economic sense to order in truckload quantities? Would your supplier selection change if you ordered truckload quantities?


Question:Santa Cruz Bottling is a manufacturer of organic soft drinks on the coast of central California. Its products are enjoying a growing reputation and increased demand throughout the American Southwest. Because of the high cost of transporting soft drinks, it is considering a new plant to serve the states of New Mexico and Arizona. A key concern in its search for a new location is the resultant transportation costs to serve its key markets. Following is a list of cities where its main wholesale customers are located, along with estimated annual demand in cases of product for each.

City

x-coordinate

y-coordinate

No. of cases

Phoenix

250

250

25,000

Tucson

350

125

20,000

Albuquerque

800

450

28,000

Santa Fe

850

520

17,000

a. Use the centroid method to recommend a location for the new bottling plant. Round your coordinates to one decimal place.

b. Do you have any concerns about the result? How would you deal with them?

Transmissions are delivered to the fabrication line four at a time. It takes one hour for transmissions to be delivered. Approximately four vehicles are produced each hour, and management has decided that 50 percent of expected demand should be maintained as safety stock. How many kanban card sets are needed?

See all solutions

Recommended explanations on Business Studies Textbooks

View all explanations

What do you think about this solution?

We value your feedback to improve our textbook solutions.

Study anywhere. Anytime. Across all devices.