/*! This file is auto-generated */ .wp-block-button__link{color:#fff;background-color:#32373c;border-radius:9999px;box-shadow:none;text-decoration:none;padding:calc(.667em + 2px) calc(1.333em + 2px);font-size:1.125em}.wp-block-file__button{background:#32373c;color:#fff;text-decoration:none} Q25P Question 25: (III) A 265-kg load... [FREE SOLUTION] | 91Ó°ÊÓ

91Ó°ÊÓ

Question 25: (III) A 265-kg load is lifted 18.0 m vertically with an acceleration a = 0.160 g by a single cable. Determine (a) the tension in the cable; (b) the net work done on the load; (c) the work done by the cable on the load; (d) the work done by gravity on the load; (e) the final speed of the load assuming it started from rest.

Short Answer

Expert verified
  1. The tension in the cable is 3012.5 N.
  2. Net work done on the load is 7479.4 J.
  3. Work done by the cable on the load is 54,225 J.
  4. Work done by the gravity on the load is 46,746 J.
  5. The final speed of the load is \(7.51\;{\rm{m/s}}\).

Step by step solution

01

Work-energy principle

According to the work-energy principle, the net work done by an object is equal to the change in kinetic energy of that object, i.e.,

\(\begin{array}{c}\Delta KE = {W_{{\rm{net}}}}\\K{E_{\rm{f}}} - K{E_{\rm{i}}} = {W_{{\rm{net}}}}\end{array}\)

02

Given information

Mass of load is m = 265 kg.

Displacement of load in vertically upwards direction is s = 18.0 m.

Acceleration of the load is a = 0.160g.

Here, g is the acceleration due to gravity.

The initial speed of the load is \({v_{\rm{i}}} = 0\;{\rm{m }}{{\rm{s}}^{ - 1}}\).

Let the final speed of the load is \({v_{\rm{f}}}\).

03

Free-body diagram of the load

A free-body diagram of the load is shown in the figure below:

The forces acting on the load are as follows:

  • Tension in the cable T acting vertically upwards.
  • Force of gravity, \({F_{\rm{g}}} = m{\rm{g}}\) acting vertically downwards.
  • Net force due to acceleration, \(F = ma\) acting vertically upwards.
04

(a) Determining tension in the cable

Let us take a vertically upward direction as the positive direction. From the figure, apply Newton’s second law in the vertical direction.

\(\begin{array}{c}T - m{\rm{g}} = ma\\T = ma + m{\rm{g}}\\ = m\left( {a + {\rm{g}}} \right)\\ = \left( {265\;{\rm{kg}}} \right) \times \left( {0.160{\rm{g}} + {\rm{g}}} \right)\\ = \left( {265\;{\rm{kg}}} \right) \times \left( {1.16 \times 9.8\;{\rm{m }}{{\rm{s}}^{ - 2}}} \right)\\ = 3012.5\;{\rm{N}}\end{array}\)

Thus, the tension in the cable is 3012.5 N.

05

(b) Determining net work done on the load

Since the direction of both the net force and the displacement of the load are vertically upward, the net work done on the load is as follows:

\(\begin{array}{c}{W_{{\rm{net}}}} = Fs\cos 0^\circ \\ = mas\cos 0^\circ \\ = \left( {265\;{\rm{kg}}} \right) \times \left( {0.16 \times 9.8\;{\rm{m/}}{{\rm{s}}^2}} \right) \times \left( {18.0\;{\rm{m}}} \right)\\ = 7479.4\;{\rm{J}}\end{array}\)

Thus, net work done on the load is 7479.4 J.

06

(c) Determining the work done by the cable on the load

Since the direction of the force acted by the cable (i.e., tension) and the displacement of the load are vertically upward, the work done by the cable on the load is as follows:

\(\begin{array}{c}{W_{{\rm{net}}}} = Ts\cos 0^\circ \\ = \left( {3012.5\;{\rm{N}}} \right) \times \left( {18.0\;{\rm{m}}} \right)\\ = 54,225\;{\rm{J}}\end{array}\)

Thus, work done by the cable on the load is 54,225 J.

07

(d) Determining the work done by gravity on the load

Since the direction of both the force of gravity and the displacement of the load are opposite to each other, the work done by gravity on the load is as follows:

\(\begin{array}{c}{W_{{\rm{net}}}} = {F_{\rm{g}}}s\cos 180^\circ \\ = m{\rm{g}}s( - 1)\\ = \left( {265\;{\rm{kg}}} \right) \times \left( {9.8\;{\rm{m/}}{{\rm{s}}^2}} \right) \times \left( {18.0\;{\rm{m}}} \right) \times \left( { - 1} \right)\\ = - 46,746\;{\rm{J}}\end{array}\)

Thus, work done by the gravity on the load is 46,746 J.

08

(e) Determining the work done by gravity on the load

According to the work-energy principle, change in kinetic energy of the load is equal to the net work done by the load, i.e.,

\(\begin{array}{c}K{E_{\rm{f}}} - K{E_{\rm{i}}} = {W_{{\rm{net}}}}\\\frac{1}{2}mv_{\rm{f}}^{\rm{2}} - \frac{1}{2}mv_{\rm{f}}^{\rm{2}} = {W_{{\rm{net}}}}\\\frac{1}{2}m(v_{\rm{f}}^{\rm{2}} - v_{\rm{i}}^{\rm{2}}) = {W_{{\rm{net}}}}\end{array}\)

On substituting values of variables in the above expression, you will get final velocity as follows:

\(\begin{array}{l}\frac{1}{2} \times \left( {265\;{\rm{kg}}} \right) \times (v_{\rm{f}}^{\rm{2}} - 0) = 7479.4\;{\rm{J}}\\v_{\rm{f}}^{\rm{2}} = 56.45\;{{\rm{m}}^{\rm{2}}}{\rm{/}}{{\rm{s}}^{\rm{2}}}\\{v_{\rm{f}}} = 7.51\;{\rm{m/s}}\end{array}\)

Thus, the final speed of the load is \(7.51\;{\rm{m/s}}\).

Unlock Step-by-Step Solutions & Ace Your Exams!

  • Full Textbook Solutions

    Get detailed explanations and key concepts

  • Unlimited Al creation

    Al flashcards, explanations, exams and more...

  • Ads-free access

    To over 500 millions flashcards

  • Money-back guarantee

    We refund you if you fail your exam.

Over 30 million students worldwide already upgrade their learning with 91Ó°ÊÓ!

One App. One Place for Learning.

All the tools & learning materials you need for study success - in one app.

Get started for free

Most popular questions from this chapter

In Fig. 6-31, water balloons are tossed from the roof of a building, all with the same speed but with different launch angles. Which one has the highest speed when it hits the ground? Ignore air resistance. Explain your answer.

Fig. 6-31 Problem 12

Two blocks of mass\({m_{\rm{A}}}\)and\({m_{\rm{B}}}\), resting on a frictionless table, are connected by a stretched spring and then released (Fig. 7–48). (a) Is there a net external force on the system before release? (b) Determine the ratio of their speeds,\({v_{\rm{A}}}/{v_{\rm{B}}}\)(c) What is the ratio of their kinetic energies? (d) Describe the motion of the CM of this system. Ignore mass of spring.

A satellite in circular orbit around the Earth moves at constant speed. This orbit is maintained by the force of gravity between the Earth and the satellite, yet no work is done on the satellite. How is this possible?

(a) No work is done if there is no contact between objects.

(b) No work is done because there is no gravity in space.

(c) No work is done if the direction of motion is perpendicular to the force.

(d) No work is done if objects move in a circle.

A rectangular block of wood floats in a calm lake. Show that, if friction is ignored, when the block is pushed gently down into the water and then released, it will then oscillate with SHM. Also, determine an equation for the force constant.

A hill has a height h. A child on a sled (total mass m) slide down starting from rest at the top. Does the speed at the bottom depends on the angle of hill if (a) it is icy and there is no friction, and (b) there is friction (deep snow)? Explain your answers.

See all solutions

Recommended explanations on Physics Textbooks

View all explanations

What do you think about this solution?

We value your feedback to improve our textbook solutions.

Study anywhere. Anytime. Across all devices.