/*! This file is auto-generated */ .wp-block-button__link{color:#fff;background-color:#32373c;border-radius:9999px;box-shadow:none;text-decoration:none;padding:calc(.667em + 2px) calc(1.333em + 2px);font-size:1.125em}.wp-block-file__button{background:#32373c;color:#fff;text-decoration:none} Q32E Investment risk analysis. The ri... [FREE SOLUTION] | 91Ó°ÊÓ

91Ó°ÊÓ

Investment risk analysis. The risk of a portfolio of financial assets is sometimes called investment risk. In general, investment risk is typically measured by computing the variance or standard deviation of the probability distribution that describes the decision maker’s potential outcomes (gains or losses). The greater the variation in potential outcomes, the greater the uncertainty faced by the decision maker; the smaller the variation in potential outcomes, the more predictable the decision maker’s gains or losses. The two discrete probability distributions given in the next table were developed from historical data. They describe the potential total physical damage losses next year to the fleets of delivery trucks of two different firms.

Firm A




Firm B



Loss Next Year

Probabiity


Loss Next Year

Probability

0

0.01



0

0


500

0.01



200

0.01


1000

0.01



700

0.02


1500

0.02



1200

0.02


2000

0.35



1700

0.15


2500

0.3



2200

0.3


3000

0.25



2700

0.3


3500

0.02



3200

0.15


4000

0.01



3700

0.02


4500

0.01



4200

0.02


5000

0.01



4700

0.01


a. Verify that both firms have the same expected total physical damage loss.

b. Compute the standard deviation of each probability distribution and determine which firm faces the greater risk of physical damage to its fleet next year.

Short Answer

Expert verified

a.

For firm the expected value is 2450.

For firm the expected value is 3990.3

b.

The standard deviation of firm A is 661.43

The standard deviation of firmB is 2218.69

FirmB has more risk than firmA

Step by step solution

01

Given information

The variation is seen in potential outcomes of gains or losses.

02

Calculating the expected total for both firms

a.

For firmthe expected value is

Ex=0×0.01×500×0.01+1000×0.01+1500×0.02+2000×0.35+2500×0.30+3000×0.25+3500×0.02+4000×0.01+4500×0.01+5000×0.01=2450

For firm B the expected value is

Ex=0×0+200×0.01+700×0.02+1200×0.02+1700×0.15+2200×0.30+2700×0.30+3200×0.15+3700×0.02+4200×0.02+4700×0.01=3990.3

Here, we see that both firms not have same expectation. Firm B has more expectation than firm A.

03

Finding the standard deviation of the each probability distribution and calculate the greater risk

b.

Ex=02×0.01×5002×0.01+10002×0.01+15002×0.02+20002×0.35+25002×0.3030002×0.25+35002×0.02+40002×0.01+45002×0.01+50002×0.01=6440000

Then the var(x) is given by

varx=Ex2-E2x=6440000-24502=437500

The standard deviation is

sdx=varx=437500=661.43

Similarly, for firm B we calculate isEx2

Ex=02×0+2002×0.01+7002×0.02+12002×0.02+17002×0.15+22002×0.30+27002×0.30+32002×0.15+37002×0.02+42002×0.02+47002×0.01=64950000vaax=Ex2-E2x=64950000-3990.32=492027505.91

sdx=varx=492027505.91=22181.69

Thus, the greater risk is associated with the firm B.

Unlock Step-by-Step Solutions & Ace Your Exams!

  • Full Textbook Solutions

    Get detailed explanations and key concepts

  • Unlimited Al creation

    Al flashcards, explanations, exams and more...

  • Ads-free access

    To over 500 millions flashcards

  • Money-back guarantee

    We refund you if you fail your exam.

Over 30 million students worldwide already upgrade their learning with 91Ó°ÊÓ!

One App. One Place for Learning.

All the tools & learning materials you need for study success - in one app.

Get started for free

Most popular questions from this chapter

Normal probability plots for three data sets are shown on the next page. Which plot indicates that the data are approximately normally distributed?

Suppose x is a binomial random variable with p = .4 and n = 25.

a. Would it be appropriate to approximate the probability distribution of x with a normal distribution? Explain.

b. Assuming that a normal distribution provides an adequate approximation to the distribution of x, what are the mean and variance of the approximating normal distribution?

c. Use Table I in Appendix D to find the exact value of P(x≥9).

d. Use the normal approximation to find P(x≥9).

Find each of the following probabilities for the standard normal random variable z:

a.P(-≤z≤1)b.P(-1.96≤z≤1.96)c.P(-1645≤z≤1.645)d.P(-2≤z≤2)

Assume that xis a random variable best described by a uniform distribution with c=10andd=90.

a. Findf(x).

b. Find the mean and standard deviation of x.

c. Graph the probability distribution for xand locate its mean and theintervalon the graph.

d. FindP(x≤60).

e. FindP(x≥90).

f. FindP(x≤80).

g. FindP(μ-σ≤x≤μ+σ).

h. FindP(x>75).

Maintaining pipe wall temperature. Maintaining a constant pipe wall temperature in some hot-process applications is critical. A technique that utilizes bolt-on trace elements to maintain temperature was presented in the Journal of Heat Transfer (November 2000). Without bolt-on trace elements, the pipe wall temperature of a switch condenser used to produce plastic has a uniform distribution ranging from 260° to 290°F. When several bolt-on trace elements are attached to the piping, the wall temperature is uniform from 278° to 285°F.

a. Ideally, the pipe wall temperature should range between 280° and 284°F. What is the probability that the temperature will fall in this ideal range when no bolt-on trace elements are used? When bolt-on trace elements are attached to the pipe?

b. When the temperature is 268°F or lower, the hot liquid plastic hardens (or plates), causing a buildup in the piping. What is the probability of plastic plating when no bolt-on trace elements are used? When bolt-on trace elements are attachedto the pipe?

See all solutions

Recommended explanations on Math Textbooks

View all explanations

What do you think about this solution?

We value your feedback to improve our textbook solutions.

Study anywhere. Anytime. Across all devices.