/*! This file is auto-generated */ .wp-block-button__link{color:#fff;background-color:#32373c;border-radius:9999px;box-shadow:none;text-decoration:none;padding:calc(.667em + 2px) calc(1.333em + 2px);font-size:1.125em}.wp-block-file__button{background:#32373c;color:#fff;text-decoration:none} Problem 4 \(A\) can do a piece of work in ... [FREE SOLUTION] | 91Ó°ÊÓ

91Ó°ÊÓ

\(A\) can do a piece of work in 8 days, \(B\) can do it in 16 days, while \(C\) can do it in 80 days. In how many days they can complete the whole work, working together? (a) 5 (b) 6 (c) \(8 \frac{2}{3}\) (d) \(20 \frac{2}{5}\)

Short Answer

Expert verified
Answer: (a) 5 days

Step by step solution

01

Determine the fraction of work completed in one day by each individual

In one day, \(A\) completes \(\frac{1}{8}\) of the work, \(B\) completes \(\frac{1}{16}\) of the work, and \(C\) completes \(\frac{1}{80}\) of the work.
02

Calculate the total fraction of work completed by all three in one day

To find the total fraction of work completed by \(A\), \(B\), and \(C\) in one day, add the fractions from Step 1: \(\frac{1}{8} + \frac{1}{16} + \frac{1}{80} = \frac{10+5+1}{80} = \frac{16}{80}\).
03

Find the number of days needed to complete the work

To find the number of days needed to complete the work, take the reciprocal of the total fraction of work completed in one day: \(\dfrac{1}{\frac{16}{80}} = \dfrac{80}{16} = 5\). So, working together, \(A\), \(B\), and \(C\) can complete the work in 5 days. The correct answer is (a) 5.

Unlock Step-by-Step Solutions & Ace Your Exams!

  • Full Textbook Solutions

    Get detailed explanations and key concepts

  • Unlimited Al creation

    Al flashcards, explanations, exams and more...

  • Ads-free access

    To over 500 millions flashcards

  • Money-back guarantee

    We refund you if you fail your exam.

Over 30 million students worldwide already upgrade their learning with 91Ó°ÊÓ!

Key Concepts

These are the key concepts you need to understand to accurately answer the question.

Understanding Work Efficiency
When we talk about work efficiency in the context of time and work problems, we are referring to the ability of a person to complete a task within a given time frame. It's a measure of productivity, meaning how much work a person or a machine can accomplish in a unit of time. The greater the work efficiency, the more work gets done in less time.

In the provided textbook exercise, we see 'A' can do a piece of work in 8 days, which implies that 'A's efficiency allows them to complete the work within this period. 'B' and 'C', having higher number of days to finish the same task, have lower efficiency compared to 'A'. When combined, their collaborative work efficiency increases, allowing them to complete the task much quicker than any of them would individually.
Fractional Work Rate Explained
A fractional work rate refers to the part of the whole task completed in a unit of time, usually one day. This concept is crucial as it allows us to break down the entire work into manageable parts that can be attributed to workers or machines.

Fractional Work Rate in Practice

For instance, if 'A' can complete the work in 8 days, 'A's fractional work rate is \(\frac{1}{8}\) per day, meaning each day 'A' finishes one-eighth of the total task. 'B's rate being \(\frac{1}{16}\) and 'C's rate at \(\frac{1}{80}\) indicates they contribute less to the task per day. It's the division of the whole into equal fractional parts based on the time taken by each worker.
Collaborative Work Rate
The collaborative work rate is the sum of individual work rates when multiple entities are working together on a task. It provides insight into the combined productivity and is essential for planning and time management.

Combining Individual Efforts

Let's consider the combined work rate from our exercise. By adding \(\frac{1}{8}\), \(\frac{1}{16}\), and \(\frac{1}{80}\), which are the individual rates of 'A', 'B', and 'C', we obtain a collaborative work rate of \(\frac{16}{80}\) or \(\frac{1}{5}\) of the work done per day. This indicates collectively, every day, the trio completes a fifth of the entire job.
Reciprocal Work Time
Reciprocal work time is the inverse of the total work rate and is used to calculate the total time taken by all workers combined to complete a task. The reciprocal essentially tells us how many units of time are needed for the group to finish the work.

Reciprocal in Action

In this scenario, after finding the collaborative work rate to be \(\frac{1}{5}\), we calculate the reciprocal of this fraction to determine the total time needed. The reciprocal of \(\frac{1}{5}\) is 5, meaning 'A', 'B', and 'C' working together will finish the task in 5 days. Remember, the reciprocal work time gives us the total duration when workers pool their efforts.

One App. One Place for Learning.

All the tools & learning materials you need for study success - in one app.

Get started for free

Most popular questions from this chapter

\(B\) and \(C\) are equally efficient, but the efficiency of \(A\) is half of each \(B\) and \(C . A\) and \(B\) started a work and 3 days later \(c\) joined them. If \(A\) alone can do the work in 14 days, then in how many more days the work will be completed? (a) 1 (b) 2 (c) 3 (d) \(4.5\)

Abhishek can do a piece of work in 40 days. He alone worked at it for 8 days and then Bacchhan completed alone the rest work in 24 days. In how many days they will complete the whole work, working together? (a) \(17 \frac{1}{7}\) days (b) \(18 \frac{1}{7}\) days (c) \(9 \frac{1}{6}\) days (d) 14 days

Sonu can do a piece of work in 20 days. He started the work and left after some days, when \(25 \%\) work was done. After it Abhijeet joined and completed it working for 10 days. In how many days Sonu and Abhijeet can do the complete work, working together? (a) 6 (b) 8 (c) 10 (d) 12

\(A\) can do a piece of work in 24 days, while \(B\) can do it in 30 days. With the help of \(C\) they can finish the whole work in 12 days. How much time is required for \(C\) to complete the work, alone? (a) 100 days (b) 120 days (c) 125 days (d) 72 days

Pipe A basically used as inlet pipe and pipe B is us pipe. Pipes \(A\) and \(B\) both are opened simultaneously, all the time. When pipe \(A\) fills the tank and \(B\) empty the tank, it will take double the time than when both the pipe fill the tank. When pipe \(B\) is used for filling the tank, its efficiency remains constant. What is the ratio of efficiency of pipe \(A\) and pipe \(B\) respectively? (a) \(3: 1\) (b) \(5: 2\) (c) \(1: 3\) (d) \(3: 2\)

See all solutions

Recommended explanations on Math Textbooks

View all explanations

What do you think about this solution?

We value your feedback to improve our textbook solutions.

Study anywhere. Anytime. Across all devices.