/*! This file is auto-generated */ .wp-block-button__link{color:#fff;background-color:#32373c;border-radius:9999px;box-shadow:none;text-decoration:none;padding:calc(.667em + 2px) calc(1.333em + 2px);font-size:1.125em}.wp-block-file__button{background:#32373c;color:#fff;text-decoration:none} Problem 178 Suppose that \(X\) has a lognorm... [FREE SOLUTION] | 91Ó°ÊÓ

91Ó°ÊÓ

Suppose that \(X\) has a lognormal distribution with parameters \(\theta=10\) and \(\omega^{2}=16\). Determine the following: (a) \(P(X<2000)\) (b) \(P(X>1500)\) (c) Value exceeded with probability 0.7

Short Answer

Expert verified
(a) \(P(X < 2000) \approx 0.275\); (b) \(P(X > 1500) \approx 0.749\); (c) Value exceeded with probability 0.7 is approximately 2693.

Step by step solution

01

Understanding Lognormal Distribution

The lognormal distribution of a variable \(X\) with mean \(\theta\) and variance \(\omega^2\) implies that \(\ln(X)\) is normally distributed with mean \(\mu = \theta\) and variance \(\sigma^2 = \omega^2\). Therefore, \(\ln(X)\) is \(N(10, 16)\).
02

Translating to Standard Normal

To solve these problems, convert \(\ln(X)\) to a standard normal variable \(Z\) using the formula: \[Z = \frac{\ln(X) - \mu}{\sigma} = \frac{\ln(X) - 10}{4}\] since the standard deviation \(\sigma\) is the square root of the variance, \(4\).
03

Calculating P(X < 2000)

For part (a), we want \(P(X < 2000)\). Compute \(\ln(2000)\) first, then standardize: \[Z = \frac{\ln(2000) - 10}{4}\] Approximating \(\ln(2000) \approx 7.6\), so \(Z = \frac{7.6 - 10}{4} = -0.6\). Use a standard normal distribution table to find \(P(Z < -0.6)\).
04

Calculating P(X > 1500)

For part (b), we compute \(P(X > 1500)\). So, find \(Z = \frac{\ln(1500) - 10}{4}\). Approximate \(\ln(1500) \approx 7.3\), thus \(Z = \frac{7.3 - 10}{4} = -0.675\). Use a standard normal distribution table to find \(P(Z > -0.675)\), which is equal to \(1 - P(Z < -0.675)\).
05

Finding Value Exceeded With Probability 0.7

For part (c), find the value \(x\) such that \(P(X > x) = 0.7\), which is equivalent to \(P(X < x) = 0.3\). Find \(Z = -0.524\) where it corresponds to \(P(Z < -0.524) = 0.3\) in the standard normal table. Solve for \(x\): \[\ln(x) = 4Z + 10\] \[\ln(x) = 4(-0.524) + 10 = 7.904\] Convert back to \(x\): \[x = e^{7.904} \approx 2693\].

Unlock Step-by-Step Solutions & Ace Your Exams!

  • Full Textbook Solutions

    Get detailed explanations and key concepts

  • Unlimited Al creation

    Al flashcards, explanations, exams and more...

  • Ads-free access

    To over 500 millions flashcards

  • Money-back guarantee

    We refund you if you fail your exam.

Over 30 million students worldwide already upgrade their learning with 91Ó°ÊÓ!

Key Concepts

These are the key concepts you need to understand to accurately answer the question.

Standard Normal Distribution
The standard normal distribution is a fundamental concept in statistics. It forms the backbone of many probability calculations.
The standard normal distribution, denoted as \( N(0,1) \), has a mean of 0 and a standard deviation of 1. It is symmetrically bell-shaped with 68% of the area under the curve falling within one standard deviation from the mean, 95% within two, and 99.7% within three.
When any normal distribution is converted into a standard normal distribution, it simplifies complex calculations by mapping scores on a common scale.To transform a given normal variable \( X \) with mean \( \mu \) and standard deviation \( \sigma \) into a standard normal variable \( Z \), the formula is as follows:
  • \[ Z = \frac{(X - \mu)}{\sigma} \]
This transformation is crucial for interpreting probability calculations and involves translating any normally distributed data into a standard form, making statistical inference more uniform and accessible.
Probability Calculations
Probability calculations are a key part of understanding statistical distributions. When dealing with normal distributions, probabilities represent the likelihood of a random variable falling below, above, or between certain values.
The standard normal distribution has designated tables, often called Z-tables, which provide the cumulative probability of a standard normal variable \( Z \) being less than a specified value. This is invaluable for deriving probabilities related to real-world data.For instance, to compute \( P(X < 2000) \) for a lognormal distribution, we first convert \( X \) to a standard normal variable \( Z \), using logarithms:
  • Calculate the logarithm of the desired value: \( \ln(2000) \)
  • Standardize using \[ Z = \frac{\ln(2000) - 10}{4} \]
  • Locate \( P(Z < -0.6) \) using the Z-table
This procedure allows us to transform the problem into one already mapped in standard distribution, thus facilitating precise calculation of probabilities.
Statistical Distribution Transformations
Statistical distribution transformations are essential methods for analyzing data that follows distributions other than the standard normal distribution, like the lognormal distribution. A lognormal distribution implies that while the data itself is skewed, its logarithm follows a normal distribution.
To solve problems related to lognormal distributions, we often perform transformations to convert skewed data into a normal form. This linearizes data, making it amenable to familiar statistical techniques.
The transformation process involves:
  • Finding the natural logarithm of the variable, converting it into a normal distribution \( \ln(X) \)
  • Standardizing this normal variable using its respective mean and standard deviation
  • Using these standardized forms to compute probabilities and percentiles
For example, to find a value \( x \) such that \( P(X < x) = 0.3 \), we find the corresponding \( Z \) value from the normal distribution table, inverse transform it to \( \ln(x) \), and then exponentiate to obtain \( x \). These transformations bridge the gap between complex real-world distributions and the simpler form of normal distribution.

One App. One Place for Learning.

All the tools & learning materials you need for study success - in one app.

Get started for free

Most popular questions from this chapter

An article in the Journal of Geophysical Research ["Spatial and Temporal Distributions of U.S. of Winds and Wind Power at 80 m Derived from Measurements" (2003, vol. 108)] considered wind speed at stations throughout the United States. A Weibull distribution can be used to model the distribution of wind speeds at a given location. Every location is characterized by a particular shape and scale parameter. For a station at Amarillo, Texas, the mean wind speed at \(80 \mathrm{~m}\) (the hub height of large wind turbines) in 2000 was \(10.3 \mathrm{~m} / \mathrm{s}\) with a standard deviation of \(4.9 \mathrm{~m} / \mathrm{s} .\) Determine the shape and scale parameters of a Weibull distribution with these properties.

Use the properties of the gamma function to evaluate the following: (a) \(\Gamma(6)\) (b) \(\Gamma(5 / 2)\) (c) \(\Gamma(9 / 2)\)

An article in Mathematical Biosciences ["Influence of Delayed Viral Production on Viral Dynamics in HIV-1 Infected Patients" \((1998,\) Vol. \(152(2),\) pp. \(143-163)]\) considered the time delay between the initial infection by immunodeficiency virus type 1 (HIV-1) and the formation of productively infected cells. In the simulation model, the time delay is approximated by a gamma distribution with parameters \(r=4\) and \(1 / \lambda=0.25\) days. Determine the following: (a) Mean and variance of time delay (b) Probability that a time delay is more than half a day (c) Probability that a time delay is between one-half and one day

Suppose that the construction of a solar power station is initiated. The project's completion time has not been set due to uncertainties in financial resources. The completion time for the first phase is modeled with a beta distribution and the minimum, most likely (mode), and maximum completion times for the first phase are \(1.0,1.25,\) and 2.0 years, respectively. Also, the mean time is assumed to equal \(\mu=1+4(1.25)+2) / 6=1.333 .\) Determine the following in parts (a) and (b): (a) Parameters \(\alpha\) and \(\beta\) of the beta distribution. (b) Standard deviation of the distribution. (c) Sketch the probability density function.

The maximum time to complete a task in a project is 2.5 days. Suppose that the completion time as a proportion of this maximum is a beta random variable with \(\alpha=2\) and \(\beta=3\). What is the probability that the task requires more than two days to complete?

See all solutions

Recommended explanations on Math Textbooks

View all explanations

What do you think about this solution?

We value your feedback to improve our textbook solutions.

Study anywhere. Anytime. Across all devices.