Chapter 1: Q6PE (page 144)
Systems that have this characteristic usually have near-zero learning.
Short Answer
Highway automated system.
/*! This file is auto-generated */ .wp-block-button__link{color:#fff;background-color:#32373c;border-radius:9999px;box-shadow:none;text-decoration:none;padding:calc(.667em + 2px) calc(1.333em + 2px);font-size:1.125em}.wp-block-file__button{background:#32373c;color:#fff;text-decoration:none}
Learning Materials
Features
Discover
Chapter 1: Q6PE (page 144)
Systems that have this characteristic usually have near-zero learning.
Highway automated system.
All the tools & learning materials you need for study success - in one app.
Get started for free
Which characteristics must a project have for critical path scheduling to be applicable? What types of projects have been subjected to critical path analysis?
What was the first major project management information system that is now commonly used for managing very large projects?
Here is a CPM network with activity times in weeks:

Determine the critical path.
The one thing that a company can do better than its competitors.
A useful tool for the economic analysis of a product development project.